Advance Scada with Wince Explorer
Burraq UK presents an advanced training course focused on WinCC Explorer, a powerful SCADA platform. This program covers the full spectrum of SCADA system development—from project setup and operator interface design to data logging, trending, alarm management, and scripting.
Aim Of Advance Scada with Wince Explorer
To provide participants with advanced skills in designing, configuring, and deploying industrial SCADA systems using WinCC Explorer, enabling real-time monitoring, control, data logging, and alarm management for complex industrial environments.
Course Overview
Advance Scada with Wince Explorer
Total Modules 10
Training Credits 30
Directed Learning Hours (DLH) 150
Course Code BUK1119
- Diploma or degree in Electrical, Electronics, Mechatronics, Instrumentation, or Automation Engineering
- Basic understanding of SCADA systems (recommended: prior experience or beginner-level SCADA course)
- Familiarity with PLC programming and industrial automation concepts
- Engineers, technicians, and professionals working in process control, utilities, or manufacturing industries
| Course Code | Curriculum Title | Credit | DLH |
|---|---|---|---|
| BUK1119-1 | Industrial Automation Basics | 2 | 25 |
| BUK1119-2 | Basic Knowledge | 2 | 25 |
| BUK1119-3 | Programmable Logic Controllers (PLC) | 2 | 25 |
| BUK1119-4 | WINCC Explorer Professional project | 2 | 25 |
| BUK1119-5 | Data & Communications | 2 | 25 |
| BUK1119-6 | Project overview | 2 | 25 |
| BUK1119-7 | Running the Project | 2 | 25 |
| BUK1119-8 | User administration | 2 | 25 |
Learning Objectives
- Industrial Automation Basics
- Basic Knowledge
- Programmable Logic Controllers (PLC)
- Quick Review of PLC HMI SCADA
- SCADA system application( Oil GAS / factory /Metro/ Solar Power Plant /Steel Plant )
- System overview TIA Portal,
- WINCC Explorer Professional
- Creating a
- WINCC Explorer Professional project
- Configuring the connection to the
- WINCC Explorer automation system
- Structuring the operator interface
- Data & Communications
- Project overview
- Project Management
- Running the Project
- Multiuser project and client project
- WINCC Explorer SCADA Graphic Designing
- WINCC Explorer SCADA Reporting
- WINCC Explorer SCADA connection with SQL Database by taking value of
- temperature/pressure/flow/level etc.
- Alarm Logging
- Tag logging & Trend display
- Gauges, sliders, motors, pipes, tanks and other object designing on
- WINCC Explorer SCADA.
- Fundamentals of creating graphics displays for human machine interfacing
- Navigating through the plant displays
- User administration
- Message representation, message logging, message configuring
- Variable logging, trend configuring and trend plotting
- Trend plotting, and message representation including logging of data in the
- database
- Graphical Animation
- Web Buttons
- Slider Movement
- Visibility
- More Animations
- Server-side Scripting
- Client-side Scripting
- Many side scripting
- Database
- Recipes
- Faceplates for reuse and centralized modification of graphics blocks
- Background processing Global Scripting
- Reinforcement of the content by means of practical exercises on the TIA system
- model
- SCADA Designing multi screens OPC Server and Connection with SCADA, with
- same & different brand of PLC SCADA Advance.
- Engineering students or graduates in Electrical, Electronics, Mechatronics, or related fields
- Automation professionals seeking advanced SCADA skills
- SCADA/PLC technicians wanting to upskill in WinCC Explorer
- Control system engineers working in manufacturing, utilities, or industrial sectors
- Anyone with prior experience in basic SCADA or PLC programming
- All Modules within this qualification are assessed internally by the approved training Centre and externally verified by BURRAQ UK. The program uses a criterion-referenced assessment approach to ensure that learners successfully meet all required learning outcomes.
- A Pass in any unit is granted only when the learner submits valid, reliable, and authentic evidence that demonstrates achievement of the assessment criteria. The Assessor is responsible for reviewing this evidence and confirming that the learner has attained the expected standard.
- To guarantee fairness, transparency, and consistency, assessors are required to maintain a detailed audit record, clearly documenting the basis of their assessment decisions in line with quality assurance requirements.